Publisher
Springer Nature Switzerland
Reference17 articles.
1. El-adaway, I.H., Abotaleb, I.S., Eid, M.S., May, S., Netherton, L., Vest, J.: Contract administration guidelines for public infrastructure projects in the united states and saudi arabia: comparative analysis approach. J. Constr. Eng. Manage. 114, 04018031 (2018)
2. Alkass, S., Mazerolle, M., Tribaldos, E., Harris, F.: Computer aided construction delay analysis and claims preparation. Constr. Man. Econ. 13, 335–352 (1995)
3. Shahhosseini, V., Hajarolasvadi, H.: A conceptual framework for developing a BIM-enabled claim management system. Int. J. Constr. Manag. 21, 208–222 (2018)
4. Parchami Jalal, M., Yavari Roushan, T., Noorzai, E., Alizadeh, M.: A BIM-based construction claim management model for early identification and visualization of claims. SASBE 10, 227–257 (2021)
5. Guévremont, M., Hammad, A.: Review and survey of 4D simulation applications in forensic investigation of delay claims in construction projects. J. Leg. Aff. Dispute Resolut. Eng. Constr. 12, 04520017 (2020)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献