Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Mechanical Engineering
Reference47 articles.
1. Diaby M, Cruz JM, Nsakanda AL (2013) Shortening cycle times in multi-product, capacitated production environments through quality level improvements and set up reduction. Eur J Oper Res 228(3):526–535
2. Ericksen PD, Stoflet NJ, Suri R (2007) Manufacturing critical-path time (MCT): the QRM Metric for lead time. In: Technical report, Center for QRM, Wisconsin-Madison
3. Sarkar B, Buddhadev M, Sarkar S (2015) Quality improvement and backorder price discount under controllable lead time in an inventory model. J Manuf Syst 35:26–36
4. Stalk G, Hout TM (1990) Competing against time: how time-based competition is reshaping global markets. Free Press, New York
5. Suri R (1998) Quick response manufacturing: a companywide approach to reducing lead times. Productivity Press, Portland
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献