Author:
Barth Karina B.,Formoso Carlos T.
Publisher
Springer Science and Business Media LLC
Reference65 articles.
1. Ballard G (2001). Cycle time reduction in home building. In: Proceedings of the 9th Annual Conference of the International Group for Lean Construction. National University of Singapore, 1–10
2. Ballard G, Howell G (1998). Shielding production: Essential step in production control. Journal of Construction Engineering and Management, 124(1): 11–17
3. Barth K B, Formoso C T (2008). Improvement of performance measurement systems using production management dashboards. In: Proceedings of the 16th Annual Conference of the International Group for Lean Construction. Manchester, 769–778
4. Beatham S, Anumba C, Thorpe T, Hedges I (2004). KPIs: A critical appraisal of their use in construction. Benchmarking, 11(1): 93–117
5. Bellisario A, Pavlov A (2018). Performance management practices in lean manufacturing organizations: A systematic review of research evidence. Production Planning & Control, 29(5): 367–385
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献