Abstract
AbstractA bi-criteria scheduling problem for parallel identical batch processing machines in semiconductor wafer fabrication facilities is studied. Only jobs belonging to the same family can be batched together. The performance measures are the total weighted tardiness and the electricity cost where a time-of-use (TOU) tariff is assumed. Unequal ready times of the jobs and non-identical job sizes are considered. A mixed integer linear program (MILP) is formulated. We analyze the special case where all jobs have the same size, all due dates are zero, and the jobs are available at time zero. Properties of Pareto-optimal schedules for this special case are stated. They lead to a more tractable MILP. We design three heuristics based on grouping genetic algorithms that are embedded into a non-dominated sorting genetic algorithm II framework. Three solution representations are studied that allow for choosing start times of the batches to take into account the energy consumption. We discuss a heuristic that improves a given near-to-optimal Pareto front. Computational experiments are conducted based on randomly generated problem instances. The $$ \varepsilon $$
ε
-constraint method is used for both MILP formulations to determine the true Pareto front. For large-sized problem instances, we apply the genetic algorithms (GAs). Some of the GAs provide high-quality solutions.
Publisher
Springer Science and Business Media LLC
Subject
Economics and Econometrics,Business and International Management
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献