Earned value method as a tool for project control

Author:

Czarnigowska AgataORCID

Abstract

Earned Value is a well-known project management tool that uses information on cost, schedule and work performance to establish the current status of the project. By means of a few simple rates, it allows the manager to extrapolate current trends to predict their likely final effect. The method is based on a simpli-fied model of a project, but proved to be useful in practice of cost control. It is being developed to account better for schedule and time aspects. The paper outlines the basic principles of the method and its recent extension, the Earned Schedule method, and, with help of a few examples, investigates into assumptions that affect their diagnostic and predictive accuracy.

Publisher

Politechnika Lubelska

Subject

Earth-Surface Processes

Reference14 articles.

1. Burke R., Project Management. Planning and Control Techniques, John Wiley & Sons, 2006.

2. Dałkowski B.T., W trosce o publiczne pieniądze. zarządzanie projektami metodą Earned value, Materiały III Konferencji Project Management, www.spmp.org.pl/ files/3dalkowski1.pdf.

3. Christensen D.S., Using performance indices to evaluate the estimate at completion, Journal of Cost Analysis and Management, 1994 (Spring):17-24.

4. Ruskin A. M., Two issues concerning the use of Earned Value Measurements, Engineering Management Journal, 2004: 16(3) s. 26-30.

5. Evensmo J., Karlsen J.T., Earned Value Based Forecasts – Some Pitfalls, 2006 AACE International Transactions.

Cited by 16 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3