Critical Factors Responsible for Time Overruns in Nigeria Building Construction Industry

Author:

B.D. Oluyemi-Ayibiowu,J.O. Omolayo

Abstract

Time overruns are major problems facing the Nigerian construction industry. It’s of high concern to those who are involved in the construction industry. This study was carried out to identify the major causes of time overruns in the Nigerian building construction industry, by means of a literature review and a questionnaire survey. A total of twenty (20) time overrun causative factors were obtained from the literature. The questionnaire survey was distributed to randomly selected respondents from a combination of clients, consultants, contractors, site engineers, project managers and sub-contractors. In all, one hundred and forty-one (141) questionnaires were distributed to randomly selected respondents (clients, consultants, contractors, site-engineers, project-managers and sub-contractors), one hundred and thirty-two (132) questionnaires were returned out of which three (3) questionnaires were found incomplete and invalid. Only one hundred and twenty-nine (129) questionnaires were found consistent and valid for use in this research. Relative Importance Index (RII) and Severity Index were used to carry out a ranking analysis. Based on the data received, the five (5) most severe factors influencing project handling overtime in Nigeria construction industries are Inaccurate evaluation of projects time/duration (91.9%), Risk and uncertainty associated with projects (91.6%), Complexity of works (87.6%), Weak regulation and control (86.8%) and Lack of financial power with severity (86.3%).

Publisher

African - British Journals

Reference25 articles.

1. Abdullah, M.R., Aziz, A.A.A. and Rahman, I.A. (2010). ‘Causes of delay and its effects in large MARA construction project’. International Journal of Integrated Engineering (Issue on Mechanical, Materials and Manufacturing Engineering). 10(2): 58-66.

2. Aftab, H.M., Jamilus M.H. and Ismail, A.R. (2013). “The Way Forward in Sustainable Construction; Issues and Challenges”, International Journal of Advances in Applied Sciences (IJAAS); Vol.2, No.1; ISSN: 2252-8814; 3-42.

3. Ahmed, S.M., Azhar, S., Kappagantula, P. and Gollapudi, D. (2003). ‘Delays in Construction: A Brief Study of the Florida Construction Industry’. ASC Proc. the 39th Annual Conference Clemson Univ. South Carolina, 257-266.

4. Alaghbari, W., Kadir, M.R.A., Salim, A. and Ernawati (2007). ‘The significant factors causing the delay of building construction projects in Malaysia’. Eng. Const. Arch. Manage. 14(2): 192-206.

5. Al-Momani, A. (2000). “Construction delay: a quantitative analysis”. International Journal of Project Management, 18 (1), 51-59.

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3