Network Analysis on Phase 1B Building of the University Health Centre, FUTA, using Critical Path Method (CPM) and Program Evaluation Review Technique (PERT)

Author:

O.A. Oladimeji,M.A. Akomolafe,T.A. Lasisi,O.A. Oloja,L.A. Oladimeji

Abstract

Project planning and scheduling plays a vital role in estimating the time and cost angle of a project. Finalizing a project on time and within the budget is challenging. This study focused on finding the shortest possible time required to complete the phase 1B Building project of the University Health Centre, FUTA and also to evaluate the probability of completing the project within the stipulated time. This project work has been able to give a concise view about network analysis in building construction; definitions of some terms commonly used in network analysis was also stated. Also, an introduction to CPM and PERT was stated; assumptions of CPM, advantages and disadvantages of CPM were stated; assumptions, advantages and disadvantages of PERT were also stated. Data analysis was carried out and all the possible routes of the activities involved in the building project were found; the location of the critical path of the building project was also found; the expected duration for every activity in the building project was determined; the probability of completing the project within the stipulated time was also evaluated. The results showed that there is a 50% chance for the project to be completed within the stipulated time. With the information gathered on the building project, the project was delayed due to some factors such as low circulation of money, inadequate equipments, loss of some weeks due to a change in plan, and inadequate manpower; thus, there was a two month difference between the initial completion and the now actual completion time.

Publisher

African - British Journals

Reference11 articles.

1. [1]. Bagshaw, K.B (2011), Quantitative analysis for Business Decisions. Port-harcourt:Nyraide Enterprises Nigeria.

2. [2]. Banjoko S.A.,(2005),Productionand Operation Management, Pumark Nigeria Ltd, Lagos.

3. [3]. Fleming, Q. W., & Koppelman, J. M. (2016). Earned value project management (4th ed.). Project Management Institute

4. [4]. Gopalasamy, P. and Mansor, Z.(2013) An investigation on project management standard

5. [5]. Harris, A.D. and Gonzales, R.F., (1981), The Operational Management: Role Problems and Techniques, West Publishing Company, St Paul.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3