1. International Union of Railways, "UIC 774-3R, Track/Bridge Interaction Recommendations for calculations,2nd edition," International Union for Railways, Paris,France, 2001.
2. LWR Manual, "Long Welded Rails, 3rd Revision," Indian Railways Institute of Civil Engineering (IRICEN), Pune, 2017.
3. RSI Guideline, "RDSO guidelines for carrying out rail-structure interaction studies on metro systems, Version 2," Research Designs and Standards Organization, India, 2015.
4. UIC 60 rail section, RF 1, Sheet 1 OF 6, IRS track Manual.
5. Ó. Ramos Gutiérrez, F. Schanack, G. Carreras and J. Retuerto, "Bridge length limits due to track-structure interaction in continuous girder prestressed concrete bridges," Engineering Structures, vol. 196, p. 109310, 2019. https://doi.org/10.1016/j.engstruct.2019.109310