1. Aqlan, F., Lam, S. S., & Ramakrishnan, S., An integrated simulation-optimization study for consolidating production lines in a configure-to-order production environment, International Journal of Production Economics, Vol 148 (2014), pp.51-61
2. Barletta, I., Andersson, J., Johansson, B., May, G., & Taisch, M., Assessing a proposal for an energy-based overall equipment effectiveness indicator through discrete event simulation, In Simulation Conference (WSC) 2014 Winter, pp. 1096-1107.
3. Bhasin, S. and Burcher, P., Lean Viewed as a Philosophy. International Journal of Manufacturing Technology Management, Vol 17, No.1 (2006), pp.56-72.
4. Cesarotti, V., Giuiusa, A., and Introna, V., Using Overall Equipment Effectiveness for Manufacturing System Design, In operations management In Tech (2013)
5. Colares, E. M. T., How to solve the trade-off between capacity utilization and service level (n.d.).