1. (1) Southworth, F.H., MacDonald, P.E., Harrell, D.J., Shaber, E.L., Park, C.V., Holbrook, M.R., Petti, D.A., November 2003, “The Next Generation Nuclear Plant (NGNP) Project”, INEEL/EXT-03-0115, Idaho National Engineering and Environmental Laboratory.
2. (2) Lebenhaft, J.R., February 2002, “MCNP4B Modeling of Pebble Bed Reactors,” MS Thesis, Department of Nuclear Engineering, University of Massachusetts Institute of Technology, Cambridge, MA., U.S.A..
3. (3) Jing, X., Xu., X., Yang, Y., Qu, R., 2002, “Prediction Calculations and Experiments for the First Criticality of the 10 MW High Temperature Gas-cooled Reactor-test Module,” Nuclear Engineering and Design, 218, pp 43-49.
4. (4) Seker, V.¸ Çolak, Ü., 2003, “HTR-10 Full Core First Criticality Analysis with MCNP,” Nuclear Engineering and Design, 222, pp 263-270.
5. (5) Lewis III, T.G., Tsvetkov, P.V., 2009, “Physics Features of TRU-Fueled VHTRs,” Hindawi Publishing Corporation Science and Technology of Nuclear Installations.