Towards Addressing Challenges of Achieving Force Account Targets in Tanzania: The Case of Construction Projects Supervised by the Mbeya University of Science and Technology Consultancy Bureau

Author:

Massawe Justus1

Affiliation:

1. Mbeya University of Science and Technology, Tanzania

Abstract

With three main objectives in mind: cost reduction, a shortened timeline, and higher quality, Political influence has used the force account technique extensively in Tanzania since 2016. This led to a range of procurement-related force account difficulties for the public in construction projects. By identifying the obstacles to force account targets and offering solutions that could help to enhance all construction projects in Tanzania that would utilise the force account mechanism, this study sought to strengthen the implementation of construction projects utilising the force account mechanism. The study used a cross-sectional survey research design and a sample of 98 respondents from the Mbeya, Songwe, and Njombe regions of the southern highlands. Construction projects were carried out in these areas using the force account system run by MUST or in coordination with its co-company, MCB. The study's data was gathered through surveys, an interviewing guide, and observations. The validity and reliability of each variable construct in the questionnaires were assessed, and the Pearson product-moment correlation coefficient was employed to gauge the strength of the linear relationship between the study variables (r). The study also acknowledges that if the highlighted concerns are remedied, the method can contribute to the improvement of construction projects. The difficulties that prevent the implementation of force account mechanisms in construction projects include time-consuming hidden costs, the requirement for strict oversight of local funds, a lack of commitment among committee members, political influence, a lack of allowance for committee members, and poor estimation of committee members. The force account system inside the government public procurement legal framework has been found to have a positive and substantial influence on cost reduction, quality enhancement, and adherence to time management. This, in turn, will yield advantageous outcomes for building projects. It is advisable to allocate more resources towards enhancing the execution of building projects in the public sector by employing force account procedures. This approach aims to enhance the performance of public procurement and bolster institutional effectiveness.

Publisher

Mbeya University of Science and Technology

Reference12 articles.

1. Dyhrfjeld-Johnsen, J., Santhakumar, V., Morgan, R. J., Huerta, R., Tsimring, L., & Soltesz, I. (2007). Topological determinants of epileptogenes are in large-scale structural and functional models of the dentate gyrus derived from experimental data. Journal of neurophysiology, 97(2), 1566-1587.

2. Mbabazi, F. and Mugurusi, G. (2019), “Adoption of force account mechanism in road maintenance works’ procurements: stakeholders’ opinions in Uganda”, in Thai, K.V., Salia, P. and Mwakibinga, F. (Eds), Advancing Public Procurement: Theories and Practices, pp. 167-180.

3. Mchopa, A.D. (2020), “Applicability of force account approach in procurement of works in Tanzania”, Journal of International Trade, Logistics and Law, Vol. 6 No. 2, pp. 137-143.

4. Mlinga R. (2018). The uses of Force account in Works and its Challenges: Tanzania Procurement Journal

5. MoEST (2017), Utaratibuwaununuzikwakutumia force account katikaujenzinaukarabatiwashulenavyuo, Ministry of Education Science, Technology and Vocational Training (MoEST), Dar es salaam.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3