Author:
Chen H.,An F.,Wang Z.,Chen X.
Abstract
The bottom drainage roadway plays a crucial role in preventing coal and gas outbursts by using underground gas drainage methods. Therefore, it is essential to select the ideal position of the bottom drainage roadway. In this paper use a combination of geological data and numerical simulation to study the ideal position of the bottom drainage roadway, we taking the gas drainage of the first workface of No. 3 coal seam in the Yuxi coal mine in China as an example. The geological study showed a limestone marker layer at an average vertical distance of 14 m from the first mining face. Using this marker layer, the bottom drainage roadway could be excavated without the risk of accidentally exposing the coal seam, and less crosscutting borehole drilling from the bottom drainage roadway would be required. Based on the needs of gas control, the layout of the bottom drainage roadway was selected as an external stagger type. Combined with the numerical simulation results, when located 20 m outside of the mining workface 'footprint' on the horizontal projection, the bottom drainage roadway was a sufficient distance from the stress concentration area during mining of workface 1301, which facilitated roadway maintenance. Furthermore, the length of the crosscutting boreholes is also relatively short, which reduces the amount and cost of drilling. The results of this study are expected to provide a reference for the selection of an ideal position of the bottom drainage roadway in field engineering.
Publisher
Academy of Science of South Africa
Subject
Materials Chemistry,Metals and Alloys,Geotechnical Engineering and Engineering Geology
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献