How Combined Cycle Configuration is Impacted by Current Power Market Requirements

Author:

Zachary Justin1

Affiliation:

1. Bechtel Power Corporation, Frederick, MD

Abstract

In the past 20 years, the equipment manufacturers have made significant strives to develop better and more cost effective products: gas turbines, steam turbines, Heat Recovery Steam Generators (HRSG), water treatment, fuel treatment equipment etc. Consequently, the Combined Cycle Power Plants (CCPP) have become, due to many technological breakthroughs, the most efficient form of electrical power generation from fossil fuel, reaching or exceeding net efficiencies of 60%. We are also witnessing a substantial penetration of Renewable in the power generation mix. The Renewable intermittent nature of generation associated with new grid requirements for spinning reserves and/or frequency control must be considered when new CCPP are conceptually designed. The paper will examine several CCPP configurations, involving one, two, and three gas turbines. Substantial improvements in the efficiency are usually associated with an increased gas turbines electrical output. Various scenarios of plant configurations with targeted, sensible level of integration will be examined. The challenges of major equipment selection (gas turbines, heat recovery steam generator steam turbines, heat sink) for each of the configurations will be examined from an EPC (Engineering, Procurement, Construction) Contractor perspective, based on the lessons learned from the development and execution of more than 30 advanced CCPPs. A special emphasis will be given to the strategy of providing the CCPP with fast start-up, capability, rapid load changes, without negatively impacting part-load efficiencies and emissions. The effect of plant configuration on plant reliability, maintenance requirements and recommended spare parts will also be discussed. Finally the paper describes the lessons learned, in plant configuration selection that can be successfully employed on future projects through judicious equipment selection at the development phase, design optimization and proper project management at the execution phase.

Publisher

American Society of Mechanical Engineers

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3