Abstract

Responding to a global market demand for clean, reliable and low-cost energy, GE Power Systems introduced its newest, most advanced generation of gas turbines in 1995. Called the H System™ this technology uses higher efficiency and output to produce electricity at lower costs than any other gas-fired power generation system available today. Efficiency. The H System™ is designed to achieve 60% thermal efficiency, a major milestone in the power generation industry. The most efficient combined-cycle systems currently in operation reach 57–58% efficiency. The use of advanced materials and a unique, steam-cooling system enable the higher firing temperatures required for this increase in efficiency. The integrated closed-loop steam cooling system uses steam from the steam turbine bottoming cycle to more efficiently cool the critical gas turbine parts, and returns the steam to the bottoming cycle where it can produce additional work in the steam turbine. Environmental Performance. The H System™ burns natural gas, a much cleaner fuel than other options such as oil or coal. In addition, the system’s higher efficiency means that less fuel is needed to produce the same amount of power, further reducing emissions of CO2 and NOx. The closed-loop steam cooling system cools both the rotating and stationary gas turbine parts to maintain combustion chamber exit temperatures for low NOx emissions, while permitting the high gas turbine firing temperatures required for increased efficiency and output. Reliability. The H System™ is based on technology proven in millions of hours of GE aircraft engine and power plant service. In particular, the lessons learned throughout the development and 7.1 million hours of worldwide operating experience of GE’s F technology have been applied to the H System™. Status. This technology has been subjected to an extensive validation process. This process includes component, scale, and full size rig testing, Full Speed No Load factory tests, and culminates in Full Speed Full Load characterization testing in a commercial power plant. This paper discusses the validation process and status for the 50 Hz S109H and 60 Hz S107H in more detail.

Publisher

ASMEDC

Cited by 12 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Advanced Gas Turbine Cooling for the Carbon-Neutral Era;International Journal of Turbomachinery, Propulsion and Power;2023-06-24

2. Evolution of Turbine Cooled Vanes and Blades Applied for Large Industrial Gas Turbines and Its Trend toward Carbon Neutrality;Energies;2022-11-25

3. Natural Gas Power;Fossil Energy;2020

4. The Hall of Fame;Gas Turbines for Electric Power Generation;2019-02-14

5. Past and Present;Gas Turbines for Electric Power Generation;2019-02-14

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3