Solar One, the 10 MWe Solar Thermal Central Receiver Pilot Plant near Barstow, Calif., completed a three-year period of power production testing in July 1987. During this period the plant’s capacity factor, system efficiency, and availability were studied to assess the operational capability of Solar One to reliably supply electrical power. The long-term performance of key plant components, such as the heliostats and the receiver, was also studied. During the three years of power production operation, Solar One achieved increases in capacity factor, system efficiency, and availability. Heliostat operation was reliable, and only small amounts of mirror corrosion were observed. Receiver tube leaks did occur, however, and were the main cause of the plant’s unscheduled outages. Solar One provided valuable lessons which will aid in the design of future solar central receiver plants.
Subject
Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment
Cited by
43 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献