Advanced Hydrogen Gas Turbine Development Program

Author:

Bancalari Ed1,Chan Pedy1,Diakunchak Ihor S.1

Affiliation:

1. Siemens Power Generation, Inc., Orlando, FL

Abstract

The U.S. Department of Energy (DOE) has awarded Siemens Power Generation the first two phases for the Advanced Hydrogen Turbine Development Program. The 3-phase, multi-year program goals are to develop an advanced syngas, hydrogen and natural gas fired gas turbine fully integrated into coal-based Integrated Gasification Combined Cycle (IGCC) plants. The Program objectives are to demonstrate 3–5 percentage points efficiency improvement over current state of the art, less than 2 ppm NOx @ 15% O2 and reduction in plant capital cost. An additional objective is to show how the advanced gas turbine – IGCC plant can be configured for CO2 sequestration readiness. These objectives represent the overall DOE Advanced Power System goal to conduct Research and Development necessary to produce fuel flexible, CO2 sequestration ready advanced IGCC power systems for FutureGen type applications. Phase 1 entails advanced technologies identification, research and development Implementation Plan preparation and new gas turbine component conceptual designs. Phase 2 focuses on novel technologies development, validation, down selection and advanced gas turbine detail design. Phase 3 involves advanced gas turbine and IGCC plant construction and validation testing to demonstrate that efficiency, emissions and cost goals will be achieved and to prove the system’s commercial viability. The end objective is to validate the advanced gas turbine technology by 2015. The SGT6-6000G was selected as the basis for this development effort, due to its high firing temperature, output power and efficiency, as well as its advanced secondary air and steam cooling systems. It will be adapted for operation on coal, refinery residue and biomass derived hydrogen and syngas fuels, as well as natural gas, while achieving high performance levels and reduced plant capital costs in $/kW. New or enhanced technologies required to achieve high plant efficiency, while minimizing emissions and capital cost, will be developed and gas turbine design changes needed for optimum integration into the IGCC plant will be carried out. The main development thrust will be in the combustion, turbine cooling, materials/coating technologies and engine integration/operational flexibility. Several combustion systems will be investigated and the most successful candidate down selected. To minimize cooling air consumption, novel cooling concepts will be investigated, and validated in rig tests. Advanced bond coats, thermal barrier coatings, superalloys and airfoil architectures will be developed to minimize cooling air use. This paper describes the first year’s Phase 1 activities in advanced concepts, technologies identification and development, plant thermal performance evaluation, gas turbine IGCC plant integration studies and new gas turbine component conceptual designs.

Publisher

ASMEDC

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3