Siemens Westinghouse Advanced Turbine Systems Program Final Summary
Author:
Diakunchak Ihor S.1, Gaul Greg R.1, McQuiggan Gerry1, Southall Leslie R.1
Affiliation:
1. Siemens Westinghouse Power Corporation, 4400 Alafaya Trail, Orlando, FL 32826-2399
Abstract
This paper summarizes achievements in the Siemens Westinghouse Advanced Turbine Systems (ATS) Program. The ATS Program, co-funded by the U.S. Department of Energy, Office of Fossil Energy, was a very successful multiyear (from 1992 to 2001) collaborative effort between government, industry, and participating universities. The program goals were to develop technologies necessary for achieving significant gains in natural gas-fired power generation plant efficiency, a reduction in emissions, and a decrease in cost of electricity, while maintaining current state-of-the-art electricity generation systems’ reliability, availability, and maintainability levels. Siemens Westinghouse technology development concentrated on the following areas: aerodynamic design, combustion, heat transfer/cooling design, engine mechanical design, advanced alloys, advanced coating systems, and single crystal (SC) alloy casting development. Success was achieved in designing and full scale verification testing of a high-pressure high-efficiency compressor, airfoil clocking concept verification on a two-stage turbine rig test, high-temperature bond coat/TBC system development, and demonstrating feasibility of large SC turbine airfoil castings. The ATS program included successful completion of W501G engine development testing. This engine is the first step in the W501ATS engine introduction and incorporates many ATS technologies, such as closed-loop steam cooling, advanced compressor design, advanced sealing, and high-temperature materials and coatings.
Publisher
ASME International
Subject
Mechanical Engineering,Energy Engineering and Power Technology,Aerospace Engineering,Fuel Technology,Nuclear Energy and Engineering
Reference9 articles.
1. Little, D. A., Bannister, R. L., and Wiant, B. C., 1993, “Development of Advanced Turbine Systems,” ASME Cogen Turbo Power ’93 Proceedings, IGTI, ASME, New York, 8, pp. 271–280. 2. Briesch, M. S., Bannister, R. L., Diakunchak, I. S., and Huber, D. J., 1994, “A Combined Cycle Designed to Achieve Greater Than 60 Percent Efficiency,” ASME J. Eng. Gas Turbines Power, 117, pp. 734–741. 3. Bannister, R. L., Cheruvu, N. S., Little, D. A., and McQuiggan, G., 1995, “Development Requirements for an Advanced Turbine System,” ASME J. Eng. Gas Turbines Power, 117, pp. 723–732. 4. Diakunchak, I. S., Bannister, R. L., Huber, D. J., and Roan, D. F., 1996, “Technology Development Programs for the Advanced Turbine Systems Engine,” ASME Paper No. 96-GT-5. 5. Gaul, G., Diakunchak, I. S., and Dodd, A. M., 2001, “The W501G Testing and Validation in the Siemens Westinghouse Advanced Turbine Systems Program,” ASME Paper No. 02-GT-399.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Étude on Gas Turbine Combined Cycle Power Plant—Next 20 Years;Journal of Engineering for Gas Turbines and Power;2015-10-27 2. Transient Response of Thermal Paints for Use on Short-Duration Hypersonic Flight Tests;14th AIAA/AHI Space Planes and Hypersonic Systems and Technologies Conference;2006-06-15
|
|