Availability Analysis of a Steam Boiler in Textile Process Industries Using Failure and Repair Data: A Case Study

Author:

Patil Suyog S.1,Bewoor Anand K.2,Patil Rajkumar B.3

Affiliation:

1. Department of Mechanical Engineering, Zeal College of Engineering, Savitribai Phule Pune University, Pune 411007, India; Department of Mechanical Engineering, Sharad Institute of Technology College of Engineering, Yadrav, Ichalkaranji, Maharashtra 416115, India

2. Department of Mechanical Engineering, Cummins College of Engineering, Pune, Maharashtra 411052, India

3. Center for Advanced Life Cycle Engineering (CALCE), University of Maryland, College Park, TX 20742; Department of Mechanical Engineering, Annasaheb Dange College of Engineering and Technology, Sangli, Ashta, Maharashtra 416301, India

Abstract

Abstract The demand of steam in process industries is increasing rapidly, and this demand can be met by increasing the capacity utilization of steam boilers. Many of the process industries depend on industrial steam boilers as a vital component for their operation. The availability of the boiler can be improved by identifying critical mechanical subsystems/components concerning failure frequency, reliability, and maintainability and minimizing their likelihood of occurrences. The selection of appropriate technique for data collection and reliability analysis is essential. The time between failure (TBF) and time to repair (TTR) of all components and subsystems were collected to carry out reliability, availability, and maintainability (RAM) analysis. The best-fit distribution and distribution parameters were calculated using reliasoft software weibull++10 after performing trend testing. The preventive maintenance intervals of all components and subsystems and the availability of the system were evaluated. The analysis reveals that the combustion system, feed-water system, and blow-down system are the critical subsystems from a reliability perspective and are still the biggest reasons for the boiler downtime. The research study also showed that TTR was longer for the combustion system than the other subsystems, and thus, to enhance its availability, it is suggested that maintenance resources should be allocated at the appropriate moment to the combustion system. The study also shows the usage of RAM analysis in deciding the preventive maintenance intervals of components/subsystems of the boiler. It also provides a reference for the preparation of the maintenance plan for the boiler system.

Publisher

ASME International

Subject

Mechanical Engineering,Safety Research,Safety, Risk, Reliability and Quality

Reference40 articles.

1. Failure Analysis of the Wall Tubes of a Water-Tube Boiler;Eng. Failure Anal.,2017

2. Failure Analysis of the Boiler Water-Wall Tube;Eng. Failure Anal.,2017

3. Assessment of the Pitting Corrosion Degradation Lifetime; Case Study of Boiler Tubes;ASCE-ASME J. Risk Uncertainty Eng. Syst., Part B,2017

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3