Affiliation:
1. Rolls-Royce Industrial & Marine Gas Turbines Limited, Ansty, Nr Coventry, England
Abstract
The RB 211 DLE series staged, pre-mix, lean burn combustor, demands total integration of control system and combustion hardware.
The controls design process is described from the conception of the Engine Management System (EMS), which provides protection and control in separate environments, through to implementation of engine development testing.
The process of devising an acceptable fuelling strategy to each combustion stage is discussed. This identified the requirements for the computation of complex routines in order to control combustion zone temperatures.
The sensitivity of the control design to external conditions of humidity, ambient temperature and fuel composition are explored.
Extensive simulation was used to determine necessary instrumentation accuracies.
The paper concludes with a review of the development testing and the final control system configuration.
Publisher
American Society of Mechanical Engineers
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献