Dynamic Optimization of Startup and Load-Increasing Processes in Power Plants—Part I: Method
Author:
Bausa J.1, Tsatsaronis G.1
Affiliation:
1. Institute for Energy Engineering, Technical University of Berlin, Marchstrasse 18, 10587 Berlin, Germany
Abstract
The fast startup and load-increasing process of power plants is a complex task involving several restrictions that have to be fulfilled simultaneously. An important restriction is the maximum allowed thermal stress of the steam generator pipes and the steam turbines caused by temperature gradients. In this paper the startup process is treated as a dynamic optimization problem. Any appropriate objective function can be used in this optimization problem. Examples include the minimization of fuel consumption or the minimization of the time required to reach the desired load. The maximum allowable temperature and pressure gradients in major plant components appear as additional constraints. In this paper a general method for solving these problems is presented: The dynamic process model, consisting of first-order ordinary differential equations (ODEs) and algebraic equations, is discretized over the time horizon using well established methods for the solution of ODEs. Thus, the continuous dynamic optimization problem is transformed into a large-scale non-linear parameter optimization problem with up to 20,000 optimization parameters and constraints. Such parameter optimization problems can be solved with appropriate sequential quadratic programming (SQP) methods that have become available lately. An application of this method is presented in the second part of this study by optimizing the process of rapid load increase in a single-pressure combined-cycle power plant on the basis of a simplified model.
Publisher
ASME International
Subject
Mechanical Engineering,Energy Engineering and Power Technology,Aerospace Engineering,Fuel Technology,Nuclear Energy and Engineering
Reference17 articles.
1. Lehmann, L., Klein, M., and Wittchow, E., 1996, “Der Block 4 im Kraftwerk Heyden-Referenzanlage fu¨r moderne 1000 MW-Steinkohle-Kraftwerke,” VGB Kraft., 76, No. 2, pp. 85–94. 2. Beato, A., Bolis, V., Colombo, P., De Marco, A., Quatela, S., Zizzo, A., and Marziali, F., 1992, “Study of the Start-Up Control of a Drum Boiler by Means of a Mathematical Model,” IFAC Control of Power Plants and Power Systems, Munich, pp. 115–121. 3. Akiyama, T., Matsumoto, H., and Asakura, K., 1996. “Dynamic Simulation and its Application to Optimum Operation Support for Advanced Combined Cycle Plants,” ECOS’96: Efficiency, Costs, Optimization, Simulation and Environmental Aspects of Energy Systems, P. Alvfors, L. Eidensten, G. Svedberg, and J. Yan, eds. Stockholm, pp. 337–344. 4. Biegler, L. T.
, 1984, “Solution of Dynamic Optimization Problems by Successive Quadratic Programming and Orthogonal Collocation,” Comput. Chem. Eng., 8, No. 3, pp. 243–248. 5. Cervantes, A. M., and Biegler, L. T., 1998, “Large-Scale DAE Optimization Using a Simultaneous NLP Formulation,” AIChE J., 44, No. 5, pp. 1038–1050.