GT13E2 Low Part Load Operation: Extended Flexibility Down to 30% Load

Author:

Magni Fulvio1,Grimm Frank1,Sorato Sebastiano1,Micheli Marco1

Affiliation:

1. GE Power, Baden, Switzerland

Abstract

This paper describes the development work of the Low Part Load upgrade package for the GT13E2 gas turbine fleet and the related test results of the engine validation phase. The GT13E2 gas turbine was originally designed for operation at high combined cycle efficiency and low emissions in the range from about 60% to 100% load. The upgrade package improves the minimum environmental load of the GT13E2 making it possible to operate the GT with full flexibility down to 30% relative load. In fact, in today’s energy market operational flexibility is one of the key requirements for our customers. The extended low part load capability will allow the customers to operate the power plant in combined cycle mode with high efficiency and to rapidly change the load as soon as the grid demands. The upgrade package can be retrofitted to the installed service fleet with AEV burner technology. The main challenge at low part load operation is to keep the NOx and especially the CO emissions under control. Increased emissions at lower loads were acceptable since it was not intended to operate for long periods of time at these loads. The low part load upgrade improves combustion of the gas turbine by keeping the flame temperature at higher levels. The key to success for improved combustion behavior at part load is mainly the reduction of the burner air mass flow and the redistribution of the corresponding fuel mass flow. The main measures used for the low part load concept are a further closing of the inlet guide vanes and a redistribution of the fuel gas to fewer burners. Additional measures for further reduction of the burner air mass flow at part load were also evaluated and tested. Only a combination of several measures really improves the minimum environmental load of the gas turbine and of the combined cycle efficiency, compared to the original operation concept. During the development of the low part load project each single measure was extensively validated on GT13E2 engines independently. The combination of the different measures was finally validated on a customer engine and the projected emission targets down to 30% load were successfully confirmed.

Publisher

American Society of Mechanical Engineers

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3