Challenges Faced in the Design of SLWR Configuration for the Pre-Salt Area

Author:

Senra Stael Ferreira1,Mourelle Marcio Martins1,de Andrade Edmundo Queiroz1,Torres Ana Lu´cia Fernandes Lima1

Affiliation:

1. Petrobras Research & Development Center - CENPES, Rio de Janeiro, RJ, Brazil

Abstract

With the recent discoveries of the pre-salt reservoir, new areas of the Brazilian coast rose to prominence, especially for the Santos Basin. This area is adjacent to the Campos Basin, which now accounts for around 80% of Brazilian production. In this new area, in addition to the difficulties of drilling in salt rock, the deployment of subsea production systems have also to overcome new challenges, since environmental conditions are more severe than those in the Campos Basin. Other important issues are: the water depth of about 2200 meters; the high pressure for gas injection riser; and the high CO2 content, requiring special attention to the materials that will be in contact with the production fluid. At this new production frontier, priority was given to the use of floating units with storage capacity like VLCC hulls, in order to export oil production through shuttle tankers, as no pipeline grid is available. Depending on the motions level of these VLCC vessels, the selection of a viable configuration of riser becomes crucial. Thus, some alternatives have been studied and the Steel Lazy Wave Riser (SLWR) configuration was one of the options considered to be used for production and gas injection riser functions, besides being possibly used for risers with large diameters. As this area of the Santos Basin presents more severe conditions, the free-hanging configuration (SCR) was not feasible, even with the use of VLCCs with optimized motions. In this case, the SLWR configuration was better suited to overcome the problems faced by free-hanging configuration. This paper aims to present a set of variables and its right combination involved in SLWR configuration to make it feasible, considering some key points in the design of SLWRs, for example: motions level of the floating unit, thermal insulation required for the flow assurance of production risers; difficulties faced during the installation process and the need of using clad pipes or lined pipes due to the high level of corrosion imposed by CO2 fluid content.

Publisher

ASMEDC

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Rigid Offshore Pipelines;Handbook of Pipeline Engineering;2024

2. Rigid Offshore Pipelines;Handbook of Pipeline Engineering;2024

3. Rigid Offshore Pipelines;Handbook of Pipeline Engineering;2023-10-17

4. Overcoming Challenges in the Development of Standardized Steel Riser Designs;Day 1 Mon, May 01, 2023;2023-04-24

5. Rigid Offshore Pipelines;Handbook of Pipeline Engineering;2023

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3