Marine Scour and Offshore Wind: Lessons Learnt and Future Challenges

Author:

Harris John M.1,Whitehouse Richard J. S.1,Sutherland James1

Affiliation:

1. HR Wallingford, Wallingford, Oxfordshire, UK

Abstract

The drive for developing marine offshore renewables has led to specific requirements for scour hazard assessment relating to the associated foundation structures and the cabling necessary for in-field transmission and power export. To date within the United Kingdom (UK) a number of demonstrator projects have been constructed covering wind, wave and tidal generation. However, only offshore wind has been developed at large-scale at present as part of two rounds of commercial development of offshore wind farms (OWFs). In June 2008, The Crown Estate, responsible for licensing seabed use, announced proposals for a third round of offshore wind farms to develop an additional 25 GW of energy to the 8 GW already planned for under Rounds 1 and 2. The size of these Round 3 developments will vary, but the largest of these zones will involve the construction of around 2500 seabed foundation structures. Under Round 1 and 2 developments monopile and jacket type foundations have been used, although several other European (non UK) wind farms have been built using gravity base foundations. For a wind turbine the foundations may account for up to 35% of the installed cost. Therefore, one of the future challenges for large volume installation of offshore wind is the control and minimization of these costs. For tidal energy devices one of the principal requirements for many of the devices proposed is their placement in areas of strong tidal energy, and this has implications not only for the stability of the foundation option, but also for the construction methodology. Similarly wave energy devices are designed to be located in shallow, coastal environments as either floating or bottom mounted systems. These devices, by design, are intended to be located in environments with strong wave action. This may be substantial during storm events, which has implications for the integrity of the anchoring system keeping the wave device on station or the design of the device if it is seabed mounted. This paper will explore the lessons learnt from existing offshore wind farm developments as this represents the principal body of collected monitoring data. Using these data the paper will outline some of the challenges facing the offshore renewable industry in respect of the foundation designs and specifically the requirements for scour hazard assessment using the combined experience from those developments currently operational or under construction.

Publisher

ASMEDC

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3