Abstract
According to modern grid codes (GCs), high penetration of photovoltaic power plants (PVPPs) to the utility grid requires a reliable PV generation system by achieving fault ride-through (FRT) requirements. In order to meet these requirements, there are two major issues that should be addressed to keep the inverter connected during grid fault. The two issues are the ac over-current and dc-link over-voltage that may cause disconnection or damage to the grid inverter. In this paper, the control of single-stage PVPP inverters is developed to address these issues and enhance FRT capability. The proposed control scheme introduces the dc brake chopper circuit and current limiter to protect the inverter and ride through the fault smoothly with no perceptible overcompensation. A 1.5 MW PVPP connected into the Malaysian grid and modeled in simulink is utilized to explain the proposed control scheme. The simulation results presented demonstrate the effectiveness of the overall proposed control strategy to ride through different types of faults and to help to ensure the safety of the system equipment.
Funder
"Ministry of Higher Education, Malaysia"
Subject
Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment
Reference39 articles.
1. Comprehensive Overview of Grid Interfaced Solar Photovoltaic Systems;Renewable Sustainable Energy Rev.,2017
2. Advanced PV Plant Planning Based on Measured Energy Production Results-Approach and Measured Data Processing;Adv. Electr. Comput. Eng.,2014
3. A Review of the Fault Ride Through Requirements in Different Grid Codes concerning Penetration of PV System to the Electric Power Network;ARPN J. Eng. Appl. Sci.,2015
4. Review of Advanced Grid Requirements for the Integration of Large Scale Photovoltaic Power Plants in the Transmission System;Renewable Sustainable Energy Rev.,2016
5. Marinopoulos, A., Papandrea, F., Reza, M., Norrga, S., Spertino, F., and Napoli, R., 2011, “Grid Integration Aspects of Large Solar PV Installations: LVRT Capability and Reactive Power/Voltage Support Requirements,” IEEE Trondheim PowerTech, Trondheim, Norway, June 19–23, pp. 1–8. 10.1109/PTC.2011.6019324