Preliminary Evaluation of the Bump at the End of the Railway Bridge

Author:

Nicks Jennifer E.1,Briaud Jean-Louis1

Affiliation:

1. Texas A&M University, College Station, TX

Abstract

Bumps often develop at the interface between the bridge deck and the approach embankment of a railway bridge. The differential track movement at this transition zone creates higher impact loads, reduced bridge and embankment life, possible safety hazards, and higher maintenance costs. This study investigates the extent of the problem, typical maintenance expense, reasons behind the bump, and possible solutions. Based on a survey conducted to evaluate current practice, the bump problem affects about 50% of all railroad bridges and costs each railroad company an estimated $2,550,000 on maintenance. The typical slope for current bumps is equal to approximately 1:150. Using LS-DYNA, a 3-D, non-linear finite element program, a simple, rigid system was simulated to find the range of impact forces resulting from different bump slopes. A parametric study will be conducted in the future to examine the components involved and to optimize various solutions, such as approach slabs. The results from the entire study will help to minimize the bump at the end of the railway bridge.

Publisher

ASMEDC

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Effect of Seasonal Changes on a Hybrid Soil–Geofoam Embankment System;International Journal of Geosynthetics and Ground Engineering;2017-11-29

2. Evaluation of the Deformation of a Geosynthetic-Reinforced Soil Bridge Abutment;Geo-Congress 2014 Technical Papers;2014-02-24

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3