Affiliation:
1. Bechtel Infrastructure and Power, Reston, VA 20190
2. Bechtel Oil, Gas and Chemicals, London EC4V 6RN, UK
Abstract
This paper describes a gas turbine combined cycle (GTCC) power plant system, which addresses the three key design challenges of postcombustion CO2 capture from the stack gas of a GTCC power plant using aqueous amine-based scrubbing method by offering the following: (i) low heat recovery steam generator (HRSG) stack gas temperature, (ii) increased HRSG stack gas CO2 content, and (iii) decreased HRSG stack gas O2 content. This is achieved by combining two bottoming cycle modifications in an inventive manner, i.e., (i) high supplementary (duct) firing in the HRSG and (ii) recirculation of the HRSG stack gas. It is shown that, compared to an existing natural gas-fired GTCC power plant with postcombustion capture, it is possible to reduce the CO2 capture penalty—power diverted away from generation—by almost 65% and the overall capital cost ($/kW) by about 35%.
Subject
Mechanical Engineering,Energy Engineering and Power Technology,Aerospace Engineering,Fuel Technology,Nuclear Energy and Engineering
Reference12 articles.
1. MIT CCS Project Database
2. CO2 Capture and Storage, a VGB Report on the State of the Art
3. Gaskraftverk med CO2-håndtagning. Studie av alternative teknologier,2002
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献