Decommissioning is expensive and can be a complex operation involving a series of distinct phases, including cessation of operation, site preparation, decontamination, dismantling (demolition) and disposal. Each decommissioning phase has associated risks, which need to be identified, controlled, and minimized as far as reasonably practicable. A risk-based approach has been recognized, both for ensuring safety and reducing the total decommissioning period with cost savings. A traditional hazard and operability (HAZOP) study can be conveniently extended to decommissioning HAZOP, which is a guideword-based collective multidisciplinary study identifying types of risks associated with decommissioning and allocates actions to the contractor and specialists departments for implementation. A decommissioning HAZOP enables to address the hazards and risks of decommissioning activities holistically, addresses all major contingencies, and results in safe decommissioning within budget. The presented decommissioning HAZOP study itself was completed ahead of time, without accidents. While there are other methods, decommissioning HAZOP and risk assessment was recognized as one of the effective methods for achieving the safety and project cost objectives.
Subject
Mechanical Engineering,Safety Research,Safety, Risk, Reliability and Quality
Reference16 articles.
1. Lessons Learned From Major Accidents Relating to Ageing of Chemical Plants;Chem. Eng. Trans.,2016
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献