Opportunities and Barriers to Straw Construction

Author:

White Caroline Meyer1,Howard Thomas J.1,Lenau Torben A.1

Affiliation:

1. Technical University of Denmark, Copenhagen, Denmark

Abstract

During the past decades the building industry has had a great focus on energy consumption during the use phase of a building, but currently a more holistic view of the entire lifecycle of a building is starting to emerge. With this follows a greater interest in which building materials and techniques of construction are considered. At the same time the request for a living environment free from toxins and allergenic substances, providing the basis for stress-free living and working conditions is increasingly demanded by clients for newly built homes. Since straw built houses supply a possible solution for these demands, while also offering the opportunity for very financially competitive solutions, it is of interest to determine their appropriateness in the design phase of a building. Through a study carried out by means of a review of the current state of the-art literature on straw construction, and a series of qualitative interviews with a variety of stakeholders from previous straw build housing projects, results were gathered to find the most influential motives, barriers and considerations for straw build housing construction. Based on this empirical data, a design guide has been produced to support communication between clients and the consultants and facilitate the straw build design and decision making process. The intended audiences for the design guide are clients of small scale construction projects, architects, engineers, builders of straw construction, homeowner-builders and entrepreneurs considering the use of, straw construction. The aim of the design guide is both to acting as inspiration for the clients by outlining the benefits, determine whether straw construction would be suitable for a given project, and if so, to suggest a specific approach to the design and development of a successful straw-build project, running through the main considerations and pitfalls. The main concluded difference between straw build and more conventional building techniques is not that there are more difficulties or uncertainties related to straw build, but that they are less commonly dealt with and thus perceived as a barrier to straw build, rather than simply a problem of a general character.

Publisher

American Society of Mechanical Engineers

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3