Affiliation:
1. Nuclear and Radiation Safety Center, MEP, Beijing, China
Abstract
Public participation systems in environmental impact assessment started late in our country. Relevant laws, regulations, and work protocols need to be further improved. In this study, extensive research was conducted on the public participation systems in the environmental impact assessment of foreign nuclear power plants. Analyze the current status of our public participation systems were drawn from legal aspect and the aspect of implementation. Together with case analysis, main problems of public participation systems in environmental impact assessment of China’s nuclear power plant were summarized from this study: (1) delayed information disclosure; (2) the scope of public participation need to be widened; (3) interactive platforms are required for convenient and efficient public participations instead of a single participation approach; (4) timely response to the platforms and more supervision over the participation systems are desired. Solutions to each problem are proposed to help develop relative regulations and the implementation of these regulations.
Publisher
American Society of Mechanical Engineers
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献