Practical Method for Optimizing Capacities of Private Generators Installed in Hospital Buildings During Power Outages

Author:

Uemichi Akane1,Kaito Naoki2,Yamasaki Yudai2,Kaneko Shigehiko3

Affiliation:

1. Waseda University Department of Modern Mechanical Engineering, School of Creative Science and Engineering, , 3-4-1, Okubo, Shinjuku-Ku, Tokyo 169-8555 , Japan

2. The University of Tokyo Department of Mechanical Engineering, School of Engineering, , 7-3-1, Bunkyo-Ku, Tokyo 113-8656 , Japan

3. Waseda University Major in Mechanical Engineering, Global Center for Science and Engineering, , 3-4-1, Okubo, Shinjuku-Ku, Tokyo 169-8555 , Japan

Abstract

Abstract In stand-alone operations, on-site generators must balance and meet demand at any time for second-by-second fluctuations in output and load demand. However, the previous optimization tool for private generator configuration in hospital buildings did not consider demand sufficiency. Herein, this qualitative electricity problem was solved by proposing a new optimization method that considers the balance of power supply and demand in the stand-alone operation of on-site generators during power outages. As a demand sufficiency condition, a power balance simulator obtained available configurations of private generators that can be operated within the standard alternating current (AC) frequency range of 49–51 Hz. We also compared case study results by applying these constraints to the findings of earlier studies. The same case study from an earlier paper reported that the optimal amount of photovoltaic systems installed is approximately the upper limit (set at 600 m2 in this calculation) and the optimal solution. In contrast, the optimization results with additional constraints to keep frequency fluctuations within specified limits yielded an optimal value significantly less than the previous optimization; one case study showed that the optimal installation amount of photovoltaics was 0 m2. However, the key equipment in this study was the emergency diesel generator. The emergency generator compensates for power shortages and balances supply and demand under power outages. The results suggest that case studies with demand-satisfying conditions tend to select equipment configurations that effectively improve the expected power shortage rate.

Funder

Japan Science and Technology Agency

Publisher

ASME International

Subject

Geochemistry and Petrology,Mechanical Engineering,Energy Engineering and Power Technology,Fuel Technology,Renewable Energy, Sustainability and the Environment

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Optimizing the Quantity of Diesel Generators Considering Induction Motor Start-Up and Short Circuit Occurrence;2024 6th International Youth Conference on Radio Electronics, Electrical and Power Engineering (REEPE);2024-02-29

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3