1. Perreau, M. E., 1993, “Jernieh Gas Project Challenges and Implementation Performance,” Proceedings, Asia Pacific Oil & Gas Conference Soc. of Petroleum Engineers, Singapore, pp. 13–48.
2. Jakobsen, B., 1992, “The Loss of the Sleipner A Platform,” Proceedings, Second International Offshore and Polar Engineering Conference, (ISOPE), San Fransisco, CA.
3. American Petroleum Institute (API), 1995, “Proposed Revisions to RP 2A-WSD Recommended Practice for Planning, Designing and Constructing Fixed offshore Platforms—Assessment of Existing Platforms, Draft Section 17,” Dallas, TX, Nov.
4. Dunlap, W. A., and Ibbs, W. C., 1993, Proceedings of International Workshop on “Assessment and Requalification of Offshore Production Structures,” New Orleans, LA, Dec.
5. Efthymiou, M., van de Graaf, J. W., and Tromans, P. S., 1996, “Reliability-Based Criteria for Fixed Steel Offshore Platforms,” Proceedings 15th Offshore Mechanics and Arctic Engineering Conference (OMAE) Vol I-A, pp. 129–141. 1 June, Florence Italy.