Affiliation:
1. Electric Power Research Institute (EPRI)
2. Gibbs & Hill, Inc.
Abstract
Results of engineering and optimization of 25 MW and 50 MW turbomachinery trains for compressed air energy storage (CAES) power plant application are presented. Submitted by equipment suppliers, proposals are based on the commercially available equipment. Performance data and budget prices indicate that the CAES power plant is one of the most cost effective sources of providing peaking power and load management.
Publisher
American Society of Mechanical Engineers
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献