1. The Hidden Trouble Control Technology of Wellhead at the “Three High” Gas Well in Eastern Sichuan;Nat. Gas Ind.,2008
2. High-Pressure, High-Temperature Well Construction;Oilfield Rev.,1993
3. Research on Diagnostic Methods for Downhole Working Conditions of Rod Pumping System,2003
4. Development Situation of OCTG and Production Localization of Hi-Grade OCTG (PartII);Steel Pipe,2008
5. The Application of Combined Temperature and Noise Logging Data to Deakage Location for Longgang Gas Well;Well Logging Technol.,2010