Calculating the Groundwork Volume for the Construction of Logging Roads

Author:

Matsnev Maksim V.ORCID, ,Ponomareva Natalia G.ORCID,Tveritnev Oleg N.ORCID,Tikhomirov Petr V.ORCID,Levushkin Dmitry M.ORCID,Briukhovetskii Andrei N.ORCID, , , , ,

Abstract

Organizational and engineering models provide a formalized description of the construction process, including a list of operations, their sequence, description of the relationship between the operations, and the features of the work technology. Network models have the most complete mathematical description. However, a number of authors in their works point to serious shortcomings inherent in the network modeling of construction flow. The network model allows displaying accurately enough only the relationship of specialized traffic flows when the object is divided into sections equal in size to interchangeable grips. Such schedules are quite effective in planning and operational management of road works in a short planning period (decade or month). The adequacy of the real construction representation is violated when the network model is enlarged for long-term planning of the flow. The currently developed so-called generalized network models achieve process combination and continuity by introducing links between the operations, characterized by temporal parameters assuming any values, including negative values. However, the complexity of the mathematical description of these models still prevents their use in solving optimization problems. The research aims at developing a mathematical model and an algorithm for calculating the operational control of the groundwork volume during the construction of logging roads. A model of a complex object flow is proposed, where the flow operation time has a discrete nature. This condition is realized in the model by dividing the planned operation period of a complex flow into equal time intervals – scheduling intervals. The below described model of complex road construction flow can be presented on the basis of the scheduling task classification scheme and the analysis of existing economic and mathematical models and methods. The scheduling model developed for the purpose of determining the optimal groundwork for the road construction elements is a deterministic (at the 1st stage), discrete in time, engineering model with variable speeds of operations.

Publisher

M.V. Lomonosov Northern (Arctic) Federal University

Subject

General Earth and Planetary Sciences,General Environmental Science

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3