Multi-Item Production Lot Sizing with Postponement, External Source for Common Parts, and Adjustable Rate for End Products
-
Published:2021-06-01
Issue:3
Volume:6
Page:787-804
-
ISSN:2455-7749
-
Container-title:International Journal of Mathematical, Engineering and Management Sciences
-
language:en
-
Short-container-title:Int J Math, Eng, Manag Sci
Author:
Chiu Singa Wang,Wu Hua Yao,Chiu Tiffany,Chiu Yuan-Shyi Peter
Abstract
This study considers a multi-item production lot-size problem incorporating postponement, an external source for common parts, and an adjustable-rate for end products. Dealing with product variety, timely requirements, and limited in-house capacity has led production managers to seek manufacturing schemes and utilization-reduction strategies that can help them meet customer needs, smoothen fabrication schedules, and lower overall manufacturing expenses. We propose a two-stage manufacturing scheme. The first stage produces common parts for multiproduct incorporating a partial supply from an outside contractor to reduce utilization/uptime. Stage two fabricates all end products using an adjustable-rate to reduce the uptime further. We build a model to characterize the problem’s features and use optimization methods to derive the optimal rotation cycle time in order to help managers make cost-effective lot-size decisions and allow manufacturers to gain competitive advantages. A numerical illustration validates the model’s capability and applicability. This study makes two important contributions: (1) It offers a decision-support model for studying such a particular batch-size problem and deciding the optimal rotation cycle time, and (2) it identifies the individual/collective influence of dual uptime-reduction strategies on the operating policy and various performance indexes to help facilitate managerial decision-making.
Publisher
International Journal of Mathematical, Engineering and Management Sciences plus Mangey Ram
Subject
General Engineering,General Business, Management and Accounting,General Mathematics,General Computer Science
Reference29 articles.
1. Akkermans, H., Van Oppen, W., Wynstra, F., & Voss, C. (2019). Contracting outsourced services with collaborative key performance indicators. Journal of Operations Management, 65(1), 22-47. 2. Al-Fawzan, M.A., & Al-Sultan, K.S. (1997). Economic production quantity for a manufacturing system with a controllable production rate. Production Planning and Control, 8(7), 678-685. 3. Boucher, T.O. (1987). Maximizing robot production rates for simple insertion operations. IIE Transactions, 19(4), 385-394. 4. Chiu, S.W., Kuo, J.S., Chiu, Y.S.P., & Chang, H.H. (2019). Production and distribution decisions for a multi-product system with component commonality, postponement strategy and quality assurance using a two-machine scheme. Jordan Journal of Mechanical & Industrial Engineering, 13(2), 105-115. 5. Chiu, S.W., Zhao, Z.Y., Chiu, T., & Chiu, Y.S.P. (2020b). Combining the delayed differentiation policy and common parts’ partial outsourcing strategy into a multi-item FPR-based system. Journal of Applied Engineering Science, 18(2), 273-280.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
|
|