Key value engineering protocols in marine projects

Author:

Karami Hamidreza1ORCID,Olatunji Oluwole Alfred2

Affiliation:

1. Construction Management Discipline, School of Design and the Built Environment, Faculty of Humanities, Curtin University, Bentley Campus, Perth, Australia

2. School of Design and the Built Environment, Faculty of Humanities, Curtin University, Bentley Campus, Perth, Australia

Abstract

Despite the uniqueness of marine projects, their value engineering (VE) protocols are similar to those used in other projects. Previous research suggests that problems that may be addressed using VE protocols, including cost and schedule overruns, are still prevalent in marine projects. This research was aimed at identifying key VE protocols for marine projects and their relative importance in preventing scheduling issues. Nineteen VE variables identified from the literature were grouped under four themes. Questionnaire surveys administered to participants from Australia, Iran, Hong Kong, Malaysia, Ecuador, South Africa and South Korea generated 126 valid responses. Factor analysis was used to determine the relative importance of VE variables. The findings suggest that marine projects may benefit when VE protocols achieve the following: (a) integration of objective and empirical knowledge into design; (b) use of pilot studies to understand conditions related to ground and seabed conditions; (c) consideration of work breakdown, resource allocation and inhibiting conditions; and (d) determination of alternative design options for resourcing and construction methods. The findings will guide VE stakeholders to improve productivity and reduce design and construction constraints and risk levels. Future studies may build on these findings for further understanding of cost and schedule performance problems in marine projects.

Publisher

Thomas Telford Ltd.

Subject

Safety, Risk, Reliability and Quality,General Business, Management and Accounting,Civil and Structural Engineering

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Independence and impartiality of contract administrators in the New Zealand construction sector;Proceedings of the Institution of Civil Engineers - Management, Procurement and Law;2023-04-01

2. Status of value management studies in construction projects: A systematic review;Ain Shams Engineering Journal;2023-02

3. Value Engineering Factors with an Impact on Design Management Performance of Construction Projects;Journal of Management in Engineering;2022-05

4. Editorial: In search of value: taking the reader on a journey to valuable contribution in journal publishing;Proceedings of the Institution of Civil Engineers - Management, Procurement and Law;2020-02

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3