Mud pumping in the roadbed of ballastless high-speed railway

Author:

Bian Xuecheng1,Wan Zhangbo1ORCID,Zhao Chuang2ORCID,Cui Yujun3,Chen Yunmin1

Affiliation:

1. Key Laboratory of Soft Soils and Geoenvironmental Engineering, MOE, Department of Civil Engineering, Zhejiang University, Hangzhou, P. R. China; also Center for Hypergravity Experimental and Interdisciplinary Research, Zhejiang University, Hangzhou, P. R. China.

2. Center for Hypergravity Experimental and Interdisciplinary Research, Zhejiang University, Hangzhou, P. R. China.

3. Navier/CERMES, Ecole des Ponts ParisTech (ENPC), Champs-sur-Marne, France.

Abstract

Mud pumping that is deliberately avoided in the design of a ballastless high-speed railway still occurs and induces extraordinary track vibrations. In this study, in situ investigations and laboratory tests were performed to disclose the initiation and development of mud pumping detected in the field. The in situ investigations indicated that mud pumping principally appeared at both ends of the concrete base up to a maximum distance of 2 m. Precipitation, instead of groundwater, was found to be the water source triggering mud pumping; this infiltrated the graded gravel roadbed through the detachments of the ends of the overlying concrete bases due to the whipping effect. Once mud pumping occurred, the vibrations of concrete bases were aggravated and caused severe track settlements under train loads. The results of laboratory tests indicated that the infiltrated rainwater was retained in the roadbed above the less permeable subgrade, and the roadbed contained an unstable particle skeleton with excessive plastic fine particles, both of which provided favourable conditions to form mud pumping under dense high-speed train loads. Soil particles of less than 7·1 mm in diameter migrated during mud pumping; these first accumulated at the lower roadbed, then gradually migrated to the upper roadbed, actuated by the hydraulic gradient generated, and were finally pumped out through the detachments around the expansion gaps, thereby resulting in large amounts of voids in the roadbed and a vicious cycle if not treated in a timely fashion. These features of mud pumping in ballastless tracks differ from those of ballasted tracks and will benefit the development of remediation measures and improvement of slab track designs.

Publisher

Thomas Telford Ltd.

Subject

Earth and Planetary Sciences (miscellaneous),Geotechnical Engineering and Engineering Geology

Reference45 articles.

1. Aw, E. S. (2007). Low cost monitoring system to diagnose problematic rail bed: case study at a mud pumping site. PhD thesis, Massachusetts Institute of Technology, Cambridge, MA, USA.

2. Geotextiles or geomembranes in track? British railways' experience

3. Track settlement restoration of ballastless high-speed railway using polyurethane grouting: Full-scale model testing

4. Investigation of railway track subgrade. Part 2: Case study

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3