Affiliation:
1. is project sponsor at the Olympic Delivery Authority
2. is project manager at Sir Robert McAlpine
3. is engineering leader at Buro Happold
4. is project architect at Populous
Abstract
The UK Olympic Stadium, which will host athletic events and the opening and closing ceremonies of the London 2012 Olympic and Paralympic Games, is designed to be converted to a home for British athletics. An innovative use of permanent and temporary forms was developed to meet the 80 000 games capacity and 25 000 legacy capacity, with the final structuring consisting of a permanent sunken concrete bowl and a removable upper seating tier. To save space and drive efficiencies, the majority of spectator facilities were moved outside the structure and the upper seating tier rakes outwards, resulting in the lightest stadium of its size in the world. The rapid delivery of the stadium in just 34 months was achieved through a strategy of prefabrication of concrete and steel elements and just-in-time delivery, supported by a strong collaborative team-working ethic.
Subject
Civil and Structural Engineering
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献