Affiliation:
1. is Olympic Delivery Authority project sponsor, infrastructure
2. was CLM head of structures, bridges and highways
3. is CLM design manager for infrastructure
4. is Atkins design leader
5. is Arup design leader
Abstract
The £673 million Olympic Park structures, bridges and highways project is one of the largest for the London 2012 Olympic and Paralympic Games. It involved delivering 29 bridges and underpasses, 20 km of highways, 16 km of perimeter security fencing, 11 km of retaining walls and 24 games-time operational support areas. Significant design and construction achievements were realised despite a challenging programme, lengthy procurement process and coordination with multiple stakeholders. Designs were developed to high aesthetic standards incorporating innovative approaches, structural forms and unconventional materials while meeting the challenges of constructability and phasing. Given the presence of multiple contractors, efficient management of site logistics and construction programming was essential for safe and effective delivery.
Subject
Civil and Structural Engineering
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献