Affiliation:
1. is principal sustainable development and regeneration manager at ODA
2. is head of environment and sustainability assurance at CLM
Abstract
The Olympic Park site in east London was fragmented, polluted and divided by pylons and railways. In preparation for the London 2012 Olympic and Paralympic Games, the UK's Olympic Delivery Authority has implemented environmental improvement on a huge scale – including remediating large swathes of the former industrial land, repairing and improving the waterways, removing invasive plants in river and rail corridors, and creating new habitats for native flora and fauna. This paper considers the London 2012 environmental strategy, the challenges in developing and implementing the strategy across the project, the achievements with regard to ecology, air quality, noise and waste, and the lessons which have been learned.
Subject
Civil and Structural Engineering
Reference8 articles.
1. ISO (International Organisation for Standardisation). ISO 14001: 2004: Environmental Management Systems.2004, ISO, Geneva, Switzerland.
2. Delivering London 2012: master planning
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Sustainability in Mega-Events: Beyond Qatar 2022;Sustainability;2019-11-14
2. A review and synthesis of environmentalism within the Olympic Movement;International Journal of Event and Festival Management;2019-04-25
3. Introduction;Proceedings of the Institution of Civil Engineers - Civil Engineering;2011-05