Investigating property damage along Dublin Port Tunnel alignment

Author:

Gillarduzzi Andrea1

Affiliation:

1. Head of Geotechnical Engineering, High-Point Rendel, London, UK

Abstract

During the winter of 2002/2003, Dublin City Council received various complaints regarding aesthetic and serviceability damage of several residential buildings located within the highly populated residential area of Marino (1ṡ8 km north-east of Dublin centre, in the Republic of Ireland) allegedly caused by rock-tunnelling operations of the southwards tunnel-boring machine in the northbound tunnel carried out in execution of the Dublin Port Tunnel scheme. A holistic engineering–geological ground model for the area north of Dublin centre shows that structural elements crossing the bedrock have markedly affected the geological evolution and post-glacial drainage of the site, including the formation of buried valleys. A review of groundwater monitoring and tunnel construction records has allowed the causes of settlement at ground level to be identified. These include volume loss of the ground due to deformation and local failure of the tunnel excavation, dewatering of the bedrock and of coarse strata embedded in the Boulder Clay, resulting in the removal of fine soil particles, vibro-densification due to tunnel-boring machine ground-borne vibrations, and slow production and possibly consolidation of clayey strata. A comparison between the position of the properties where damages are being claimed and that of post-glacial rivulets and lakes, backfilled in the 1920s following a rapid expansion of Dublin suburbs, clearly indicates a direct linkage between the two.

Publisher

Thomas Telford Ltd.

Subject

Safety, Risk, Reliability and Quality

Reference104 articles.

1. British Parliament. Bill for Draining and Allotting Bogs of Ireland.1830, Volume II, No. 262HMSO, London, UK, 165, Sessional papers.

2. Sea-level changes in Northern Ireland

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Award-winning papers in 2014;Proceedings of the Institution of Civil Engineers - Forensic Engineering;2016-02

2. Editorial;Proceedings of the Institution of Civil Engineers - Forensic Engineering;2014-08

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3