Affiliation:
1. Department of Civil Engineering, University of Novi Sad, Serbia
Abstract
This paper presents the results of the investigation of the large landslide that endangers the Sloboda Bridge in Novi Sad. At the time of its completion in 1981, this bridge, with pylons and stays in the central plane, was the world's largest central span bridge, with a span of 351 m. It has remained the bridge with the largest central span on the Danube. Its foundations are in a landslide area, and consist of piles that are up to 27 m long. The moving depth determined for the first sliding block is at a maximum depth of around 26 m, and for the second at a maximum of around 35 m. The movements have been measured by seven inclinometer installations. Movements have been minor and slow, yet practically continuous. For these reasons, the project has adopted repair measures in three phases: phase I, slope drainage; phase II, building a bank revetment in the Danube and regrading the slope area; and phase III, counterforts. The main conclusion is that with such large and special landslides, where the displacements are slow and fairly small, repair measures need not all be performed at the same time.
Subject
Earth and Planetary Sciences (miscellaneous),Geotechnical Engineering and Engineering Geology
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Bulk Flow Characteristics of a Gravel Bed River with Instream Emergent Vegetation;ISH Journal of Hydraulic Engineering;2022-08-02
2. Canopy‐Forming Ecosystem Engineers in Aquatic Ecosystems;Encyclopedia of Water;2019-12-29
3. Terrain drainage in the landslide area on the Danube slope in Novi Sad;Tehnicki vjesnik-Technical Gazette;2015-08-08
4. Editorial;Proceedings of the Institution of Civil Engineers - Geotechnical Engineering;2011-02