Affiliation:
1. Lyles School of Civil Engineering, Purdue University, West Lafayette, IN, USA
Abstract
Through effective and proactive monitoring, highway agencies can acquire information needed for deck repair or replacement timing decisions. However, system-wide monitoring of infrastructure requires a large expenditure outlay and therefore needs to be justified by comparing its costs to the potential savings if such monitoring leads to timely actions. This paper presents a framework that considers two strategies for managing a bridge deck network: a condition-based strategy that involves monitoring and repair and a time-based strategy that involves repairs at specific time intervals without condition monitoring. Using a case study, the paper calculates the life-cycle cost of each strategy as the sum of the monitoring and repair costs. The paper estimates that if a non-destructive test (NDT) is used as the monitoring platform system-wide, the unit monitoring cost will be $0·04–0·35/ft2 ($0·43–3·77/m2) of deck (average $0·22/ft2 ($2·37/m2)). This cost is expected to be different for other inventories due to differences in age, inventory size and bridge proximities. The paper determines that the NDT monitoring programme benefits outweigh its costs ($3·68–10·42 rate of return in repair savings for every dollar of investment in that programme). The paper also analyses the sensitivity of the outcome to key evaluation factors.
Subject
General Economics, Econometrics and Finance
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Health-monitoring methods for long-span cable-stayed bridges;Infrastructure Asset Management;2023-09-05
2. Looking to the future of bridge inspection and management in the UK;Bridge Maintenance, Safety, Management, Life-Cycle Sustainability and Innovations;2021-04-19
3. Editorial;Infrastructure Asset Management;2018-09