Affiliation:
1. Head of Hybrid Bill Preparation and Powers, HS2 Limited, UK ()
Abstract
The hybrid bill for the London-to-West Midlands phase of the UK's High Speed Two (HS2) high-speed railway weighed half a tonne, and was the largest ever deposited in parliament. Preparation, to strict requirements of parliament's standing orders, took 22 months, using a large part of the country's engineering and environmental resources, and was completed to time and on budget.
Subject
Transportation,Civil and Structural Engineering
Reference8 articles.
1. HS2 (2013d) HS2 Phase One: Equality Impact Assessment and Health Impact Assessment. See https://www.gov.uk/government/publications/hs2-phase-one-impact-assessments (accessed 05/12/2018).
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Megaprojects as niches of sociotechnical transitions: The case of digitalization in UK construction;Environmental Innovation and Societal Transitions;2023-09
2. Editorial;Proceedings of the Institution of Civil Engineers - Transport;2021-02
3. HS2 railway, UK – the parliamentary process to Royal Assent;Proceedings of the Institution of Civil Engineers - Transport;2021-02