Political and legal risks in public–private partnership mega transportation projects

Author:

Aladağ Hande1ORCID,Işik Zeynep2ORCID

Affiliation:

1. Assistant Professor, Department of Civil Engineering, Yildiz Technical University, İstanbul, Turkey

2. Associate Professor, Department of Civil Engineering, Yildiz Technical University, İstanbul, Turkey (corresponding author: )

Abstract

In Public-Private-Partnership (PPP) projects, all stakeholders may be exposed to losses due to changes in political and legal environment which certainly affect the success targets of the PPP projects. Hence, this paper aims to determine political and legal risks and identify the effect of those risks on the success of PPP mega transportation projects. Thus, the risks were determined within a systematic literature review and focus group discussion were carried out for validation. Then, an illustrative case study in Turkey was presented to better illustrate the effects of political and legal environment. Finally, Fuzzy Analytical Hierarchy Process (FAHP) method was used to identify to prioritize the identified risks. The prominent risks were found out as termination of concession by public institution, political opposition, failure/delay in obtaining permit/approval and expropriation. The evolution of determined risks with an associated case from a mega transportation project contributes to the PPP project practitioners about possible challenges in developing countries where political and legal instability is widespread. Considering the focus on transportation projects constitutes the limitation of this study, the research opens future evaluations by testing identified political and legal risks for other different kind of PPP-type projects to identify if any different perceptions exist.

Publisher

Thomas Telford Ltd.

Subject

Civil and Structural Engineering

Reference57 articles.

1. The Effect of Stakeholder-Associated Risks in Mega-Engineering Projects: A Case Study of a PPP Airport Project

2. Arslan Ç (2019) Risk Identification and Assessment for PPP Integrated Health Campus Projects in Turkey a Case Study: Kayseri Integrated Health Campus. Master's thesis, Middle East Technical University, Ankara, Turkey.

3. An Analytical Network Process model for risks prioritisation in megaprojects

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3