Improving construction schedule and cost information feedback in building information modelling

Author:

Liao Longhui1,Man Qingpeng2,Li Linhui3,Teo Evelyn Ai Lin4,Li Xiaodong5

Affiliation:

1. PhD candidate, Department of Building, National University of Singapore, Singapore

2. Lecturer, Department of Construction and Real Estate, Harbin Institute of Technology, Harbin, China

3. Master student, Department of Computer Science, Hong Kong University, Hong Kong, China

4. Associate Professor, Department of Building, National University of Singapore, Singapore

5. Professor, Department of Construction and Real Estate, Harbin Institute of Technology, Harbin, China

Abstract

When applying the existing methods of establishing building information models, model users can make construction schedules and cost estimation easily. However, the deviation and modification of schedule and cost plans as well as low data exchange efficiency would be seriously compromised under circumstances of changing, real-time on-site information. This paper serves as a foundation for a large study over 4 years on a construction information model based on building information modelling and context-aware technology. The aim of this paper is to propose a method to develop a prototype model of collaborative construction on building information modelling software to improve the efficiency of information sharing. The research methodology adopted in this paper consists of four steps. A literature survey was conducted; applications and extensions of Industry Foundation Classes model entities relating to logical relationships and construction schedule and cost information were studied. A use-case-based construction schedule–cost information feedback model was explored using context awareness technology and overall similarity measurement. With these concepts, the association between building information models and physical, on-site environment can be built. It is concluded that utilisation of the applications and extensions of Industry Foundation Classes standard, context-aware technology, and of a case-based reasoning approach may contribute to establish a collaborative construction prototype model and develop building information modelling software.

Publisher

Thomas Telford Ltd.

Subject

Safety, Risk, Reliability and Quality,General Business, Management and Accounting,Civil and Structural Engineering

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. INFLUENCE OF COLLABORATIVE RELATIONSHIPS ON THE PERFORMANCE OF DESIGN-CONSTRUCTION EFFICIENCY OF INDUSTRIALIZED CONSTRUCTION;JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT;2023-04-19

2. Design and construction of the new library at China Agricultural University;Proceedings of the Institution of Civil Engineers - Civil Engineering;2019-05-01

3. BIM for infrastructure: An overall review and constructor perspective;Automation in Construction;2016-11

4. Editorial;Proceedings of the Institution of Civil Engineers - Management, Procurement and Law;2014-04

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3