A nine-year case history of monitoring a wide pile group part I

Author:

Buttling Stephen1,Fellenius Bengt H.2,Pinijpol Naruedol3

Affiliation:

1. Principal, National Geotechnical Consultants, Brisbane, Australia (corresponding author: )

2. Consulting Engineer, Sidney, Ontario, Canada

3. Senior Project Manager, NGC Thailand, Bangkok, Thailand

Abstract

This is the first of two papers on a wide pile group. The geology and a geotechnical model of the site are presented, along with the design of a single pile, analysis of a static loading test, and some dynamic tests. Response of the piled foundations comprising 399 bored piles supporting three 70-storey towers on a common mat was monitored. Records consist of results of a static loading test, dynamic tests of four piles, the development of load in 15 piles, and settlement of 40 points during construction and nine years following. At end of construction, the perimeter piles received more load from the towers than did the interior piles and the mat settled on average 90 mm. By the end of the monitoring period, due to the general subsidence, the average settlement of the mat had increased by 50 mm. Most of the settlement is considered to originate from the compression of the soil layers below the pile toe level. A subsequent paper will present the analysis and design of the wide pile group, and the numerical analysis of the static loading test on a single pile and of the wide pile group.

Publisher

Emerald

Reference23 articles.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3