Abstract
Completed in 2017, the first £57 million phase of Cardiff’s Eastern Bay Link provides a much-needed extension to the Welsh capital’s A4232 Peripheral Distributor Road through its busy docks area. Providing significant community and environmental benefits, the 1·2 km scheme includes a 21-span viaduct and transition structure spanning access roads, a railway line and numerous buried services on a highly congested site. Early contractor involvement and a collaborative contractual approach enabled the project team and stakeholders to accommodate significant design changes to ensure successful delivery of the project safely, on time and within budget.
Subject
Civil and Structural Engineering
Reference5 articles.
1. HA (Highways Agency) 2006 TD19/06 The Requirement for Road Restraint Systems, DMRB 2.2.8 The Stationery Office London, UK
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. A systematic search and review of early contractor involvement in construction project development;Built Environment Project and Asset Management;2024-08-20
2. Editorial;Proceedings of the Institution of Civil Engineers - Civil Engineering;2019-11