Criteria and considerations for project work structuring

Author:

Mitropoulos Panagiotis1,Sanchez Ricardo2

Affiliation:

1. Civil, Construction and Environmental Engineering Department, San Diego State University, San Diego, CA, USA

2. Field Engineering Division, City of San Diego, CA, USA

Abstract

‘Work structuring’ refers to the design of the project organisation and includes how the work is divided into work packages and how the work packages are assigned to different subcontractors. Work structuring determines the scope and complexity of each work package as well as the dependencies between work packages and the need for coordination between the project participants assigned the different work packages. This study investigates the work structuring criteria that project managers use to decide the breakdown of the project scope in work packages. Data were collected on three projects through interviews with project managers and review of project records. The findings identify two major sets of factors influencing the work structuring: (1) commercial considerations, including the owner’s requirements and criteria such as budget pressures; requirements for use of local, disadvantaged and minority contractors; prequalification requirements; and licensing. (2) Production considerations including design factors, the difficulty and complexity of the work, interfaces and coordination requirements, the quality of the subcontractors who will be attracted by the work packages and potential production problems. These factors often create conflicting requirements and trade-offs that can affect project performance.

Publisher

Thomas Telford Ltd.

Subject

Safety, Risk, Reliability and Quality,General Business, Management and Accounting,Civil and Structural Engineering

Reference19 articles.

1. Multiperspective Approach to Exploring Comprehensive Cause Factors for Interface Issues

2. Object Model Framework for Interface Modeling and IT-Oriented Interface Management

3. Use of a WBS Matrix to Improve Interface Management in Projects

4. Crowston K 1991 Towards a Coordination Cookbook: Recipes for Multi-Agent Action. PhD dissertation MIT, Sloan School of Management Cambridge, MA, USA

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Work structuring and product design for customized repetitive projects;Construction Management and Economics;2021-07-13

2. A model for implementing product modularity in buildings design;Engineering, Construction and Architectural Management;2019-10-17

3. Method to Assess the Match between Clients’ Input and Decoupling Points in Customized Building Projects;Journal of Construction Engineering and Management;2018-05

4. Editorial;Proceedings of the Institution of Civil Engineers - Management, Procurement and Law;2016-06

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3