Affiliation:
1. Robert Benaim & Associates London, UK
Abstract
The A13 viaduct is a new structure carrying the A13 road around Ford's Dagenham plant. The structure was designed with the dual aim of fast mechanised construction by the use of glued segmental cantilever construction and of providing a low-maintenance structure with minimum joints and bearings. The use of continuity is actively encouraged in UK standards as it has obvious design and durability advantages; this paper describes the design and construction of this large fully continuous, precast pre-stressed segmental concrete structure. Emphasis is placed on the design and construction methods used to form the innovative 54 000 m2 monolithic deck from 1030 precast segmental units giving a 1750 m long continuous structure.
Subject
Building and Construction,Civil and Structural Engineering
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Accelerated Construction of Short Span Railroad Bridges in Iran;Practice Periodical on Structural Design and Construction;2019-02
2. Design Codes and General Design Guidance;Design Solutions and Innovations in Temporary Structures;2017